FANDOM


 
Gametitle-FO76 NW
Gametitle-FO76 NW

The Vault 94 terminal entries are a series of entries found on terminals in Vault 94 in the Fallout 76 add-on Nuclear Winter

Vault 94 access codeEdit

Fo76 Hacker Header
Welcome text

Vault 94 Access Code

Body

---BEGIN CODE---
PROC-Type:091,ENCRYPTED
DEK-Info: RobCo-SecuCrypt,VTEC-2076-2

1tRLTABtTHCh6qRA7HBW
7WUluvk0Vq245hUrG8Ql
yKZc6mfkhhhY38sGlHNO
LQ0XTJhNjvKZh6Obra77
q2imrH5ob7Rhv4fHYl2J
fUWNfmWe2Z4TNB2DZvmD
tbHNWkLso3t4L7LEIZrb
SOa0FOZNB57u9X8N4LRN
VekjU0QybSBFye0rQvKM
bGTbd9IpvxpURIoMFex9
---END CODE---

Vault access control terminalEdit

Fo76 Hacker Header
Welcome text
Body

=======Welcome to Vault 94=======
|Vault Status: <Token.Name=StatusBar>
|Vault Door: <Token.Name=DoorStatusBar>
=================================

Welcome LetterEdit

Transcript

Accessing...

Transcript

FROM THE PASTOR'S DESK:

Greetings, and Welcome to Vault 94!

On behalf of the Vault 94 intentional community, it is my pleasure to welcome you to our home. Vault 94 is founded on the principles of faith, nonviolence, and communal life in harmony with nature. Whether you share our beliefs or choose to walk your own path, know that you are always welcome among us.

Vault 94 was blessed with an abundance of resources, and we are committed to sharing them with all in need as we work together to restore the bounty of the Earth. More importantly, we hope to share our values and rebuild a common belief in the essential goodness of humanity.

If you are hungry, come and eat. If you are weary, come and rest. If you are here to trade, our stores are always open. Welcome to Vault 94. Welcome home.

--Pastor Gabriella Salavar

P.S. Please check any weapons or explosives at the reception desk as you enter.

> Vault Door ControlEdit

Transcript

Accessing...

Enter Access CodeEdit

Transcript

Accessing...

Transcript

Decrypting Access Code...
...done.
Authenticating...
...done.
Accessing Vault Door Control Interlink...
...done.
Opening Vault Door...

Search Access Code DatabaseEdit

Transcript

Connecting...

Transcript

Accessing Vault 94 Resident Database...
...done.
Cross-referencing with Pip-Boy tracking data...
...done.

A Vault Ambassador with an Access Code was dispatched to <Token.Name=V94AccessDungeon> on or about 10/23/78. Please contact them for further assistance.

Nursery terminalEdit

Fo76 Hacker Header
Welcome text
Body

11/19/78Edit

Transcript

Accessing...

Transcript

====================================
| VAULT 94 COMMUNITY NURSERY |
====================================
====================================
|11/19/78 |
|Nurse: Leah Rossi |
|Aide: Angelique Salavar |
====================================

Charges: E. Hendricks, T. Garcia, R. Hudson, T. Hudson, P. Lorenzo, K. Rossi

Daily Report:
 - Eve continues to teethe on crib frame.
 - Argument between Ruth and Paul over teddy bear. Rehearsed cooperative de-escalation dialogue. Further reinforcement needed.

11/20/78Edit

Transcript

Accessing...

Transcript

====================================
| VAULT 94 COMMUNITY NURSERY |
====================================
====================================
|11/20/78 |
|Nurse: Rachel Hendricks |
|Aide: Angelique Salavar |
====================================

Charges: E. Hendricks, R. Hudson, T. Hudson, J. Malara, P. Lorenzo, K. Rossi

Daily Report:
-NONE FILED-

Pump control stationEdit

Fo76 Hacker Header
Welcome text
Body

=================================================PUMP STATUS===============
Flood Control System: <Token.Name=V94PumpStatusFloodControl>
Flood Control Pump Alpha: <Token.Name=V94PumpStatusAlpha>
Flood Control Pump Beta: <Token.Name=V94PumpStatusBeta>
Flood Control Pump Gamma: <Token.Name=V94PumpStatusGamma>
Flood Control Pump Delta: <Token.Name=V94PumpStatusDelta>===================================
Emergency Procedures: <Token.Name=V94PumpProcedureActive>
Current Emergency Procedure: <Token.Name=V94PumpCurrentProcedure>===================================

All pumps are operating normally.

Activate Emergency ProcedureEdit

Transcript

Accessing Procedures...

Fo76 Hacker Header
Welcome text
Body

========================================

Please select the desired Emergency Procedure:

B-51Edit

Transcript

Accessing...

Transcript

Initiating Replacement Procedure B-51...
Beginning automated replacement of pump filters...
...failed.

ERROR: No replacement filters are available. Please contact Vault-Tec Procurement and reorder part VT-91Z-87JXZ01.

C-51Edit

Transcript

Accessing...

Transcript

Initiating Morale Procedure C-51...
...failed.

ERROR: The Aquaculture Lab Pool Party has been rejected by the Vault 94 Community Council. Better luck next time.

G-16Edit

Transcript

Accessing...

Transcript

Initiating Automation Procedure G-16...
Activating Emergency Maintainence Robots...
...failed.

ERROR: Emergency Maintainence Robots are not qualified to perform the required operations.

J-01Edit

Transcript

Accessing...

Transcript

Initiating Technical Support Procedure J-01...
Attempting to power-cycle the pumps...
...no effect.
Attempting to power-cycle the pumps...
...no effect.
Attempting to power-cycle the pumps...
...no effect.

Please inform Vault-Tec Maintainence that you have attempted to power-cycle the pumps, then repeat this procedure as requested.

H-62Edit

Transcript

Accessing...

Transcript

Initiating Scheduling Procedure H-62...
ERROR: No such procedure exists.

K-07Edit

Transcript

Accessing...

Transcript

Initiating Power Regulation Procedure K-07...
Attempting to recalibrate impeller voltage...
...failed.

ERROR: Calibration aborted to avoid further damage to pump circuitry.

K-18Edit

Transcript

Accessing...

Transcript

Initiating Cleaning Procedure K-18...
Beginning emergency chlorine flush of Aquaculture Lab Vats...
...failed.

ERROR: Excessive urea concentrations still detected.

ERROR: Chlorine reserves depleted. Please replace the chlorine supply and try again.

K-52Edit

Transcript

Accessing...

Transcript

Initiating Flood Control Procedure K-52...
Rerouting power to the remaining Flood Control Pump(s)...
...done.

Emergency Flood Control Procedure K-52 was activated successfully.

K-52Edit

Transcript

Accessing...

Transcript

Initiating Flood Control Procedure K-52...
...failed.

ERROR: Unable to activate Emergency Flood Control Procedure due to lack of flooding.

L-21Edit

Transcript

Accessing...

Transcript

Initiating Morale Procedure L-21...
Activating automated heat and agitation mode...
...no effect.
Deactivating automated heat and agitation mode...
...done.

The emergency hot tub protocol has failed.

M-09Edit

Transcript

Accessing...

Transcript

Initiating Flooding Procedure M-09...
...done.

Please follow the instructions from the Mainframe to complete the activation process.

M-09Edit

Transcript

Accessing...

Transcript

Initiating Flooding Procedure M-09...
...failed.

ERROR: The Emergency Flooding Procedure is counterindicated by the current emergency flooding.

N-40Edit

Transcript

Accessing...

Transcript

Initiating Reporting Procedure N-40...
Collecting automated diagnostic data... done.
Plotting performance variables... done.
Analyzing operational characteristics... done.
Reticulating splines... done.

Maintainence reports have been generated and forwarded to Vault-Tec for postmortem analysis. Please stand by.

P-47Edit

Transcript

Accessing...

Transcript

Initiating Exhaust Procedure P-47...
Venting pump radiation filters...
...done.

WARNING: Improper ventilation detected in the Pump Control Station. Please clear the room until radiation levels have returned to normal.

S-97Edit

Transcript

Accessing...

Transcript

Initiating Search Procedure S-97...
Attempting to identify missing pump components...
...failed.

ERROR: All pumps appear to be intact.

V-17Edit

Transcript

Accessing...

Transcript

Initiating Service Call Procedure V-17...
Contacting Vault-Tec Maintainence for scheduled service...done.

The next available service window is in ERRx99999999 days. Please wait for assistance.

W-05Edit

Transcript

Accessing...

Transcript

Initiating Flailing Procedure W-05...
Inverting water intake and outflow pipes...
...failed.
Setting all pipes to intake...
...failed.
Setting all pipes to outflow...
...failed.
Adjusting settings randomly... ... ...
...failed.

ERROR: Operation failed.

G.E.C.K. monitoring station terminalEdit

Fo76 Hacker Header
Welcome text
Body

===========================================
| G.E.C.K. MONITORING STATION |
===========================================
|G.E.C.K. Core Status: *CRITICAL FAILURE* |
|Fusion Generator: *MELTDOWN* |
|Replicator: *ERROR* |
|Containment Vessel: <Token.Name=V94GECKContainmentStatus>
===========================================
ERROR CODES: 0x107, 0x109, 0x401, 0x0402, 0x519...
ERROR: Catastrophic physical damage detected.
ERROR: A core meltdown is in progress.
===========================================

Containment Vessel ControlsEdit

Transcript

Accessing...

Release G.E.C.K. Wing SealsEdit

Transcript

Accessing...

Transcript

Confirming Authorization...
...done.
Accessing G.E.C.K. Wing Seals...
...done.
Releasing Seals...
...done.

Activate Containment VesselEdit

Transcript

Accessing...

Transcript

Accessing Containment Vessel Interlink... done.
Verifying Containment Vessel Integrity... done.
Closing the Containment Vessel... In Progress.

Please wait while the Containment Vessel is sealed.

Introduction to the G.E.C.K.Edit

Transcript

Retrieving file...

Transcript

INTRODUCTION TO THE G.E.C.K.
The Garden of Eden Creation Kit (G.E.C.K.) is Vault-Tec's newest and most advanced survival technology. Developed by Doctor Stanislaus Braun, Director of Vault-Tec's Societal Preservation Program, the G.E.C.K. is a fully self-contained terraforming module capable of creating and sustaining life, even amid a desolate nuclear wasteland.

The G.E.C.K. includes a cold-fusion power generator rated to last at least 1000 years, matter-energy replicators, water purifiers, atmospheric chemical stabilizers, and seed and soil supplemements. Even in the event of total global annihilation, a properly functioning G.E.C.K. will create an earthly paradise.

G.E.C.K. System LogEdit

Transcript

Accessing Log...

Transcript

G.E.C.K. SYSTEM LOG

3/1/77: Log initialized.
3/1/77: G.E.C.K. Wing Construction Complete
6/11/77: G.E.C.K. Installation Completed.
6/11/77: Dormant Mode Activated
11/20/78: G.E.C.K. Wing Access Authorized
11/20/78: G.E.C.K. Containment Vessel Opened
11/20/78: Catastophic Damage Detected
11/20/78: G.E.C.K. Fusion Generator Meltdown, resulting in Level-6 Nuclear Event.
11/20/78: Radiation surge measured at 7800 Rad/s. Significant mutations expected for any surviving organisms within the affected area (est. 5.5km)
11/20/78: Log terminated.

Export Audio Recording - 11/20/78, 17:51Edit

Transcript

Accessing...

Transcript

Exporting G.E.C.K. Audio Log for 11/20/78...
...done.

Community center terminalEdit

Fo76 Hacker Header
Welcome text
Body

====================================
[11/20/78]

06:00-07:00 - Sunrise Service, Upper Atrium
10:00-17:00 - Sharing Market, Upper Atrium
12:00-17:00 - Ambassadors & Visitors expected
12:00-17:00 - Vault Tours for Visitors
12:00-14:00 - Community Council Special Session
17:00-18:00 - Potluck Dinner, Cafeteria
18:00-19:00 - Breakdown of Sharing Market

Community council terminalEdit

Fo76 Hacker Header
Welcome text
Body

==========================================
Welcome to the Vault 94 Community Council!====================================
CURRENT MOTIONS:
<Token.Name=V94CCCurrentMotions>

CURRENT VOTES:
- NONE

Propose a MotionEdit

Transcript

ERROR: Due to the current state of emergency, no new motions can be accepted at this time. Please try again later.

Second a MotionEdit

Transcript

No motions are currently under consideration.

View Historical MotionsEdit

Transcript

Displaying the 10 most recent motions considered by the council. For access to additional records, please contact the secretary.

10/09/78
1162: 10/23 Special Service of Commemoration

Motion PASSED, CONSENSUS.

10/16/78
1163: Vault Ambassador Program

Motion PASSED, 10-1-0.
1164: Nominations for Vault Ambassador Program

Motion PASSED, 10-0-1.

10/30/78
1165: Security Preparedness/Self-Defense Training

Motion FAILED, no second.
1168: Establish Emergency Planning Task Force

Motion FAILED, no second.
1167: Approval for Peace & Justice Lecture Series

Motion PASSED, 10-0-1.

11/06/78
1166: Update Conflict De-Escalation Dialogue

Motion PASSED, 10-0-1.

11/13/78
1169: Motion to recall Ambassadors, seal Vault

Motion FAILED, no second.
1170: Proposed Welcome Day Program for Visitors

Motion PASSED, 10-1-0.



11/20/78
1171: G.E.C.K. Wing Access Authorization

Vote PASSED, 20-0-0

View Vault-Tec DocumentsEdit

Vault 94 OverviewEdit

Transcript

VAULT 94 OVERVIEW

Welcome to Vault 94!

Thank you for accepting our invitation to be a part of the Vault program. Vault 94 has been developed to respect the core values of your intentional community, as outlined in the charter and supporting documents submitted with your application.

- FAITH. With the excpetion of one (1) Vault-Tec Maintainence Engineer, all invited residents of this Vault are members of your congregation.
- NONVIOLENCE. No weapons, armor, or explosives have been supplied to this Vault, nor have any turrets or other defensive systems been installed. All robots have been locked to a nonviolent conflict resolution mode.
- COMMUNAL LIFE. Living Quarters have been clustered to create communal residential spaces instead of individual quarters. A Community Council model of government (see COMMUNITY GOVERNANCE) will encourage dialogue and consensus-building among residents.
- ECOLOGICAL HARMONY. Vault 94 has extensive agricultural facilities. You are encouraged to use these for the benefit of your community and any other survivors of the nuclear apocalypse (see MISSION & FACILITIES).

Vault 94 Community GovernanceEdit

Transcript

VAULT 94 COMMUNITY GOVERNANCE

Vault 94 has not been assigned a Vault-Tec Overseer. Instead, this Vault is to be governed by a Community Council system. All Vault residents are encouraged to attend and participate in Community Council sessions.

This terminal has been provided to automatically record the minutes and motions before the Council. In the event that consensus on a proposal cannot be achieved, this terminal can also be used to conduct a community vote. Residents may vote by swiping their Resident ID Cards in the card readers to either side of this desk.

Vault 94 Mission & FacilitiesEdit

Transcript

VAULT 94 MISSION & FACILITIES

In the event of global nuclear war, multiple mass extinction events are anticipated. The primary mission of Vault 94 is to monitor and stabilize the local ecosystem in the aftermath of such a war, and to assist other survivors outside the Vault (if any) with their needs.

To that end, Vault 94 has been equipped with a complete agricultural facility, including a comprehensive seed bank containing all known plants suitable for edible or medicinal use.

To prevent damage to the seed bank, Vault 94's Vault Door will automatically seal when external radiation reaches unsafe levels. The Vault Door may be reopened after a mandatory minimum shelter period of one year. Vault Residents are then encouraged to work with any survivors outside the Vault to assess the state of the environment and work to improve it.

Vault 94 has also been selected to receive a Garden of Eden Creation Kit (G.E.C.K.) module. In the event of catastophic environmental devestation, your G.E.C.K. may be the best hope for the survival of humanity in this region. In order to prevent misuse, access to the G.E.C.K. facility requires a vote of the Community Council.

Export Audio Recording - 11/20/78, 12:04Edit

Transcript

Exporting Community Council recording for 11/20/78...
...done.

ConfirmEdit

CancelEdit

Community Council terminalEdit

Fo76 Hacker Header
Welcome text
Body

==========================================
Welcome to the Vault 94 Community Council!====================================
CURRENT MOTIONS:
<Token.Name=V94CCCurrentMotions>

CURRENT VOTES:
<Token.Name=V94CCCurrentVotes>


Please select a motion to second:

1172: G.E.C.K. Wing Access AuthorizationEdit

Transcript

Motion 1172, G.E.C.K. Wing Access Authorization, has been seconded. A community vote is required in order for this measure to pass.

Based on registered Vault occupancy, <Token.Name=V94GECKVoteTotal> votes in the affirmative will be required. Voting will remain open for twenty-four hours.

Test log 5-31-77-P3Edit

Transcript

Accessing Log...

Transcript

Leaves are showing decreased chlorophyll. Browning not just of the edges, but all the way to the stalk. I think we can say this one is a dud. I don't know if it isn't binding is due to the concentration of the distillate or an incompatible sequence. Wouldn't be so bad if we weren't all afraid of running the centrifuge, but after the accident last month, we've all been on edge. Unfortunately it seems that the closest solution we've managed so far becomes volatile when at too great a concentration. As in, explosively volatile. Luckily no one was hurt.

No full time staff anyway. We always have more interns.

Ugh. I can't believe I have to work on Memorial Day. Arktos isn't paying me enough for this.

Test log 4-17-77-P6Edit

Transcript

Accessing Log...

Transcript

=====================================================
* !! System Error !! *
=====================================================

              ::: Error Code 141 :::

Log file corrupt.

Operations terminalEdit

Fo76 Hacker Header
Welcome text
Body

========VAULT 94 OPERATIONS CENTER=======
|Vault Status: EMERGENCY |
|Vault Door: SEALED |
|EMERGENCY OPERATION IN PROGRESS |
=========================================
=====EMERGENCY MAINTAINENCE PROTOCOL=====
|Flood Control System: <Token.Name=V94PumpStatusFloodControl>
|Flood Control Pump Alpha: <Token.Name=V94PumpStatusAlpha>
|Flood Control Pump Beta: <Token.Name=V94PumpStatusBeta>
|Flood Control Pump Gamma: <Token.Name=V94PumpStatusGamma>
|Flood Control Pump Delta: <Token.Name=V94PumpStatusDelta>
=========================================
PROTOCOL INSTRUCTIONS:
- Proceed to the Pump Control Station.
- Activate Emergency Flood Control Procedure K-52.

OR

==========VAULT 94 OPERATIONS CENTER=========
|Vault Status: EMERGENCY |
|Vault Door: SEALED |
|EMERGENCY OPERATION IN PROGRESS |
=============================================
===============HAZMAT PROTOCOL===============
|Radiation Level: CRITICAL |
|Internal Sensors: <Token.Name=V94OpsSensorGridStatus>
|Radiation Source: <Token.Name=V94OpsRadiationSource>
=============================================
PROTOCOL INSTRUCTIONS:
- Activate Internal Sensors to isolate the source.
- Identify and neutralize the source.

OR

==========VAULT 94 OPERATIONS CENTER=========
|Vault Status: EMERGENCY |
|Vault Door: SEALED |
|EMERGENCY OPERATION IN PROGRESS |
=============================================
=========EMERGENCY FLOODING PROTOCOL=========
|Security State Code: AX-481 |
|Flooding Protocol: M-09 |
|Emergency Evacuation: IN PROGRESS |
=============================================
PROTOCOL INSTRUCTIONS:
- Flooding Protocol M-09 activated successfully.
- Complete the Emergency Evacuation.

Activate Internal Sensor NetworkEdit

Transcript

Accessing...

Transcript

Accessing Sensor Network Controls...
...done.
Recalibrating Sensors...
...done.
Activating Internal Sensor Network...
...done.

Radiation source detected in the G.E.C.K. Wing.

G.E.C.K. Wing Access ControlsEdit

Transcript

Accessing...

Exterior security terminalEdit

Fo76 Hacker Header
Welcome text
Body

=======Welcome to Vault 94=======
Vault Status: <Token.Name=V94StatusBar>
Vault Door: <Token.Name=V94DoorStatusBar>===========================

Security Log - 10/21/77Edit

Transcript

Accessing Log...

Transcript

Security Log
Date: 10-21-77
User: Tyrone Hayes, Maintainence Engineer

At 09:30 this morning, we recieved the decryption keys to unseal the new orders for Vault 94. The other members of the Vault staff completed their assignments and have departed for Vault-Tec University, leaving me here alone.

As instructed, I contacted the invited residents, Pastor Salavar and her congregation, and informed them that Vault 94 is ready to receive them should the worst occur.

Security Log - 10/23/77Edit

Transcript

Accessing Log...

Transcript

Security Log
Date: 10-23-77
User: Tyrone Hayes, Maintainence Engineer

As soon as the signal came in, I called the pastor and urged her to leave for the Vault at once. She should be arriving with the first wave of residents within the hour. A second bus is due later this afternoon. I'm heading in to make sure everything is ready for their arrival, and to see if I can stall the door a little longer.

User Log - 10/24/78Edit

Transcript

Accessing Log...

Transcript

User Log
Date: 10-24-78
User: Maria Collins, Greeter

The Vault reopened yesterday afternoon. Pastor Gabriella led us in prayer for the victims of the war, then gave her blessing to the Ambassadors being sent forth on their missionary work.

I volunteered to take a shift here to make sure any visitors who come by are properly welcomed to our community. I also hope to set up a garden so we can begin testing some of our crops next spring. We need to understand what the Earth is still fit to nurture if our work is to be of use to others.

Tyrone Hayes' terminalEdit

Fo76 Hacker Header
Welcome text
Body

====================================
USER: Tyrone Hayes, Maintainence Engineer

Please select an option:

Issue Maintenance Access CodeEdit

Transcript

Issuing Emergency Maintainence Access Code...
...done.

This access code will be valid for 24 hours.

View Personal LogsEdit

Transcript

Accessing Logs...

VAULT 94 OVERSEER INSTRUCTIONSEdit

Transcript

CONFIDENTIAL CONFIDENTIAL CONFIDENTIAL
OVERSEER EYES ONLY | VIOLATION VTP-01011

You have been selected as the special Overseer for Vault 94.

Vault 94 is designed to test the adaptability of ideological groups to changing social contexts. The selected residents are all members of an agrarian, pacifist religious community, and are expected to reinforce that identity during the one-year shelter period. Thereafter, they have been encouraged open the Vault to other survivors, who will likely be armed and desperate. Vault 94 has been allocated high-value resources, but no weapons or other defenses. The residents will need to modify their belief system, improvise, and adapt quickly in order to ensure their survival.

In order to minimize disruptions to their social order and avoid contaminating the experiment, you will be the sole representative of Vault-Tec in this Vault. You are to maintain your current assignment as a Vault-Tec Maintainence Engineer and minimize your interaction with the other residents. The Vault will be self-governing; you have no authority and are avoid any role in their decision-making process.

Once the initial shelter period ends, you are to encourage the residents to reopen the Vault if they have not already done so. Please observe the ensuing conflicts and report your findings using the secure channel provided.

VAULT-TEC SECURE CHANNELEdit

Transcript

Accessing Vault-Tec Secure Channel...
...failed.

The Secure Channel has been disabled. Please check your settings and reinitialize the connection.

Personal Log - 10/24/77Edit

Transcript

Personal Log
Date: 10-24-77
User: Tyrone Hayes, Maintainence Engineer

I can't sleep. Can't shake the sound of those people, pounding outside the Vault Door.

I went for a walk around 2am. Found the Pastor's daughter crying out in the atrium. We talked for a while-- seems like a nice girl. She deserved better than this. We all did.

What the hell, Vault-Tec? I'm an engineer, not a secret agent. I mean, sure, grateful not to be dead and all, but I never signed on for this. I wish I'd never enrolled at VTU.

Personal Log - 11/2/77Edit

Transcript

Personal Log
Date: 11-2-77
User: Tyrone Hayes, Maintainence Engineer

It's strange, being an outsider in a community like this. Everyone knows everyone else, and they all just-- get along. They don't curse, don't argue, barely even raise their voices. Everyone's still in shock, but there hasn't been a single fight. It would be creepy, if it wasn't so nice.

Pastor Salavar is still pretty cold-- I think she blames me for all the people who got locked out, even if she won't say so. But everyone else is polite, even if they keep their distance.

Personal Log - 1/14/78Edit

Transcript

Personal Log
Date: 1-14-78
User: Tyrone Hayes, Maintainence Engineer

I've been spending more time with Angelique lately-- she's working as an Aide in the Nursery, and I've always liked kids. We get along pretty well. Her mother keeps hovering, though, or sending people to check up on us. She still doesn't trust me.

Personal Log - 3/6/78Edit

Transcript

Personal Log
Date: 3-6-78
User: Tyrone Hayes, Maintainence Engineer

Another Sunday, another Community Council meeting. I was reluctant to go at first-- it's against the Directive-- but they need the technical expertise, and refusing would just seem suspicious. So long as I don't speak up too much, I'm sure it'll be all right.

Personal Log - 5/29/78Edit

Transcript

Personal Log
Date: 5-29-78
User: Tyrone Hayes, Maintainence Engineer

I was always pretty solitary growing up. Living in a community like this, it's been different. I wish I'd had friends like this years ago.
 
I've started going to morning services. I don't know that I believe it all, but it seems to work for them. Might as well go along.

Personal Log - 8/28/78Edit

Transcript

Personal Log
Date: 8-28-78
User: Tyrone Hayes, Maintainence Engineer

Angelique and I are engaged. We announced it at the council meeting this afternoon. Pastor Salavar didn't take it well, but everyone else was happy for us. Angelique says I should just giver her mother time-- she just hasn't gotten over the divorce yet.

Personal Log - 10/5/78Edit

Transcript

Personal Log
Date: 10-5-78
User: Tyrone Hayes, Maintainence Engineer

The shelter period ends in a couple of weeks. The Council's been debating Salavar's Ambassador program-- sending people out to search for survivors and invite them to the Vault. I've done everything I can to talk them out of it, but they won't listen. The world out there-- it's not going to be like we left it.

Vault-Tec expects them to crack, ditch their beliefs, fight to survive. But I know these people-- I'm one of them, now. They won't do it. And I don't want them to.

Personal Log - 10/16/78Edit

Transcript

Personal Log
Date: 10-16-78
User: Tyrone Hayes, Maintainence Engineer

I came clean. I told the Council everything, but they wouldn't believe me. So I showed them the damn Instructions.

Salavar was smug-- said she was right about me all along. And Angelique-- I've never seen her look at me like that before. It was horrible.

The Ambassador program passed anyway.

Personal Log - 10/18/78Edit

Transcript

Personal Log
Date: 11-18-78
User: Tyrone Hayes, Maintainence Engineer

The first Ambassadors are due back in a couple of days. Even now, we could seal the Vault and live here, safely, forever. Nothing has to change.

But they're convinced I'm wrong, that Vault-Tec was wrong. That whoever is left out there will finally understand the futility of war, that they'll be ready to listen, to live in peace.

I guess we'll see.

Emergency management terminalEdit

Fo76 Hacker Header
Welcome text
Body

===========================================
| VAULT-TEC EMERGENCY MANAGEMENT SYSTEM |
===========================================

Please confirm that your team has assembled and is ready to begin. Once you confirm your acceptance of this mission, the Vault Door will cycle, and no further personnel will be permitted in or out of the Vault until the operation has been completed.



==========================================
Emergency Code: [FC-855] Flooding, Severe

Diagnosis: Catastrophic flooding has been detected in the Vault. Flood Control system failure is imminent.

Resolution Protocol:
- Acquire an Emergency Maintainence Access Code.
- Proceed to the Pump Control Station.
- Activate Emergency Flood Control Procedure K-52.

Timeframe: 15 Minutes

ConfirmEdit

CancelEdit

Reception desk terminalEdit

Fo76 Hacker Header
Welcome text
Body

Vault-Tec Vault Door Control Interface
Vault Door Status: <Token.Name=V94DoorStatus>

Vault Door Control InstructionsEdit

Transcript

Accessing File...

Transcript

VAULT-TEC VAULT DOOR SYSTEM
SPECIAL INSTRUCTIONS - VAULT 94

Please refer your Vault-Tec Security Manual for complete operating instructions. The following special instructions supercede the indicated paragraphs for this Vault only.

16.2.2.7. Automatic Closure
The Vault 94 Vault Door has been interlinked with the Vault's radiation detection system. The Door will automatically close once radiation outside the Vault reaches levels consistent with a significant nuclear event. Once closed, the Door cannot be reopened by any means until the mandatory shelter period has elapsed.

16.2.7.1. Vault Door Access Interface
Due to the unique nature of Vault 94's community, the Vault 94 Community Council has been empowered to issue Access Codes for the Vault Door. These Access Codes may be used at the security terminals inside or outside of the Vault in lieu of the standard Pip-Boy Interface.

Close Vault DoorEdit

Transcript

Accessing...

Transcript

Accessing Vault Door Control Interlink...
...failed.

ERROR: Due to the current state of emergency, all controls from this station have been locked out. Please see the Emergency Management Terminal for authorized emergency access.

Open Vault DoorEdit

Transcript

Accessing...

Transcript

Accessing Vault Door Control Interlink...
...failed.

ERROR: Due to the current state of emergency, all controls from this station have been locked out. Please see the Emergency Management Terminal for authorized emergency access.

Security Log - 10/21/77Edit

Transcript

Accessing Log...

Transcript

Security Log
Date: 10-21-77
User: Nathan Simms, Vault-Tec Security

Per orders from Vault-Tec, I've wiped the old security logs. We're shipping out this afternoon.

Best of luck to the new residents. Not that they'll need it-- this place is loaded.

Security Log - 10/23/77Edit

Transcript

Accessing Log...

Transcript

Security Log
Date: 10-23-77
User: Tyrone Hayes, Maintainence Engineer

Pastor Salavar and the first residents arrived around noon, just as radiation started climbing. I tried throwing some lead plating over the sensors to tamp them down, but the failsafe tripped around 1:30, and the Vault Door locked down.

The other bus didn't make it until 3:00. There was nothing I could do-- the system's hardwired to lock out the controls until the end of the shelter period. Everyone's in shock. Salavar blames me. I think they all do. God, I can still hear them pounding outside the door.

Reception Log - 10/28/78Edit

Transcript

Accessing Log...

Transcript

Reception Log
Date: 10-28-78
User: Mike Ramirez, Usher

Pastor asked me to take charge of the office up here, set up a proper reception desk. Took me a couple of days to get the place cleaned up and install the lockers for a weapons check, but I think it's all in order now. Not expecting any visitors for a couple of weeks, but you never know.

In the meantime, I got plenty of time to work on my crosswords.

Reception Log - 11/20/78Edit

Transcript

Accessing Log...

Transcript

Reception Log
Date: 11-20-78
User: Mike Ramirez, Usher

First visitors showed up a little before noon today, right on schedule. Rough looking bunch-- things must be real bad out there.

They wanted to know who was in charge, so I sent them down to meet with the Council. They blew right by the weapons check. Shame, after all the work I went through to set up those lockers.

Icon cut contentThe following is based on Fallout 76 cut content and has not been confirmed by canon sources.

Greenhouse monitoring terminalEdit

Fo76 Hacker Header
Welcome text
Body

========================================
Temperature Regulation System: *ERROR*
---Greenhouse #1: *ERROR*
---Greenhouse #2: *ERROR*
---Greenhouse #3: *ERROR*
---Greenhouse #4: *ERROR*
Radiation Sensors: *ERROR*
Macroorganism Sensors: *ERROR*
Microorganism Sensors: *ERROR*

ERROR: Multiple faults detected. Please contact a technician for assistance.

Greenhouse ControlsEdit

Transcript

Accessing...

Transcript

Accessing Greenhouse Control System...
...failed.

ERROR: Unable to connect to the Greenhouse Control System. Please contact a technician for assistance.

Pest Control SystemEdit

Transcript

Accessing...

Fo76 Hacker Header
Welcome text
Body

ZapZ Electric Pest Control System
Status: INACTIVE

Activate Pest Control SystemEdit

Transcript

Accessing...

Transcript

Accessing ZapZ Control Interface... done.
Activating ZapZ!

Deactivate Pest Control SystemEdit

Transcript

Accessing...

Transcript

Accessing ZapZ Control Interface... done.
Deactivating ZapZ!

Access Security SystemEdit

Transcript

Accessing...

Transcript

Accessing Vault-Tec Security Interlink...
...0 Security Turret(s) found.
...0 Security Robot(s) found.
...0 Other Security System(s) found.

ERROR: No security systems available.

ADMINISTRATOR NOTE***
Due to Vault-Tec directives, Vault 94 has not been equipped with defensive systems, and all robots have been locked to a nonviolent conflict resolution protocol. Please see the Community Council Terminal for more information.

Issue Administrator PasswordEdit

Transcript

Authorizing...

Transcript

Verifying Credentials...
...done.
Issuing Network Administrator Password...
...done.

WARNING: Due to union regulations, this password cannot unlock any terminal requiring a Maintainence Access Code.

Community content is available under CC-BY-SA unless otherwise noted.

Fandom may earn an affiliate commission on sales made from links on this page.

Stream the best stories.

Fandom may earn an affiliate commission on sales made from links on this page.

Get Disney+