Fallout Wiki
Advertisement
Fallout Wiki

The Institute Robotics terminal entries are a series of entries on terminals in Institute Robotics in Fallout 4.

Robotics terminal[]

This wall-mounted Institute terminal is located next to the door to the synth processing room.

Transcript

==== Institute Central Network ====
ROBOTICS TERMINAL 1B

Departmental Notices[]

Impending Arrival[]

Transcript

Our monitoring of events on the surface has confirmed that the time is almost at hand. Very soon, our guest will be here. I admit that I feel both hope and trepidation when I think of how our first meeting will go.

Please make whatever preparations that you deem necessary. Consider all sensitive information to be classified for the time being. We cannot know for certain what our visitor's motivations will be, especially after coming into contact with the Railroad. We will exercise caution, but we must also extend a warm welcome. In time, once a measure of trust has been earned, we can be more forthcoming.

I need not remind you all how important this is to me personally, but I want you also to think of the opportunity for the entire Institute. We stand to gain a great deal if we make the most of that opportunity.

- Father

Power Conservation Update[]

Transcript

I recently met with Dr. Li to review the latest power distribution metrics, and there is both good news and bad to share. I'll begin with the good.

It's clear that we have all taken to heart Doctor Li's request for a greater emphasis on power conservation. The metrics demonstrate that we have improved our efficiency across the board. I'm particularly proud to note that the Robotics division has shown the most improvement in this regard, surpassing even Advanced Systems. Well done.

Unfortunately, the efforts we have made to date are simply not enough. We must continue to find ways to conserve without adversely impacting our research and production. I know that what I'm asking is difficult, but I'm also completely confident that we will rise to the challenge.

I have some ideas that will be discussed in the next Director's meeting. Until then, I ask that you please keep the need for conservation foremost in your thoughts.

- Father

Concerns re: Child Synth Prototype[]

Transcript

I'm concerned at the pace of our progress in correcting the problems with the child synth prototype. I cannot impress upon this division enough the need to resolve these issues quickly and completely. Time and again, we've corrected flaws only to see them return. I find myself questioning whether we're thoroughly testing these fixes before moving on to the next item.

You know that I have great faith in all of you, but time is quickly running out. I must ask that you take whatever measures are necessary to meet the project targets within the time frame.

Please make this your foremost priority.

- Father

Missing Synth Investigation[]

Transcript

It has been brought to my attention that some of you are displeased with the methods and practices employed by the SRB division in its ongoing investigation into the missing third-generation synths. I'd like to take a moment to address this matter.

Firstly, know that I am aware of your concerns and that I intend to have a conversation with Director Ayo in order to ensure that he is also aware. Any disruption to your work must be taken seriously, especially at this critical time.

However, I must also ask for a measure of patience and cooperation from all of you. It is simply impossible to gather the information necessary to carry out this investigation without an element of distraction and inconvenience.

Remember that your cooperation is vital to bringing this investigation to a swift and successful conclusion. I'm sure that's something we all want.

- Father

Synth vs.Android[]

Transcript

As production of our gen-3 synths continues apace, I would like to take this opportunity to formalize our categorization.

The term android has been used interchangeably with synth for as long as the Institute has existed. And though some of our older residents may actually prefer android (Dr. Zimmer being a prime example), the term synth has always been more widely used.

Today, our third generation creations are truly synthetic beings, so the designation synth seems more appropriate than ever.

From here on in, I strongly prefer all official Institute records and correspondences use the term synth or synths. Let us remember our past, and appreciate the legacy of the android. But let us live for the future, and recognize the power of the synth.

- Father

View Access Logs[]

Transcript

ACCESS LOG

Access: Local. Login: Binet.A
Notes: Reviewed work crew assignments, remove flight risk candidates

Access: Local. Login: Binet.A
Notes: Access department notices

Access: Local. Login: Binet.A
Notes: Updated sixth-generation optic suite design schematic

Access: Local. Login: Loken.M
Notes: Access department notices

Access: Local. Login: Binet.A
Notes: Submit second-draft plan for alpha-phase testing on VM functionality 3.0

Access: Remote. Login: Ayo.J
Notes: REDACTED

Robotics terminal[]

This wall-mounted Institute terminal is located on the southern wall, to the right.

Transcript

==== Institute Central Network ====
ROBOTICS TERMINAL 3A

Maintenance Requests[]

Transcript

Submitted By: Oberly.N

"Found unit J2-84 cleaning board room. For the third day in a row. I don't think this unit has ever actually LEFT the board room" [Navigation software patched, unit returned to service]

Submitted By Ayo.J

"Unit X4-72 complaining of blurred vision in right eye." [Unable to correct w/o permanent damage, unit wiped and reassigned to Facilities division]

Submitted By Filmore.A

" Primary drive breakdown on B3-47. Third unit this month! Can we please look into this?" [Technician dispatched]


Submitted By Thompson.E

"Looks like latest navigation software update has some issues. Found two Gen 1s trying to walk through walls." [Pathfinding software updated, all Gen 1 units will require patch. Facilities notified.]

Submitted By Binet.L

"Hey dad. Eve is having trouble speaking today. Lot of stuttering. Can you please look into it?" [Identified rare looping issue in speech subroutines, corrected and patched]

Surface Work Crew Tracking[]

Transcript

Group Ident: G3376
Assigned Units: P1-77, J8-32, F5-93, N5-48, K6-70
Location: Site Epsilon
Elapsed Time: 16:21:43
Last Report: 0:12:16

NOTES:
ALERT: Raider attack, 1 unit abducted. SRB notified. Awaiting update. [Loken.M]

Group Ident: G2199
Assigned Units: K2-90, R6-01, J8-28
Location: Site Gamma
Elapsed Time: 37:09:01
Last Report: 2:20:42

NOTES:
Report is now overdue. Continue to monitor. I'd give it another 2 days. [Binet.A]

Group Ident: G2024
Assigned Units: C8-65
Location: Site Alpha
Elapsed Time: 62:19:55
Last Report: 1:13:40

NOTES:
Units H7-44, B6-21, K0-84 recalled. [ERROR, NO DATA PRESENT]

Group Ident: G1672
Assigned Units: G6-43, M9-11, L7-92, W4-40, Q2-87
Location: Site Delta
Elapsed Time: 124:23:15
Last Report: 0:37:10

NOTES:
Not getting as much as we were hoping for here. Might need to shut down Site Delta. Let's see what the next report brings. [Loken.M]

Group Ident: G1486
Assigned Units: R7-81, T3-54, B8-88, J1-74
Location: Site Alpha
Elapsed Time: 160:33:12
Last Report: 1:56:40

NOTES:
Unit B8-88 removed, unit T3-54 added. [ERROR, NO DATA PRESENT]

View Access Logs[]

Note: This is the default entry version.

Transcript

ACCESS LOG

Access: Local. Login: Binet.A
Notes: Update maintenance requests

Access: Local. Login: Binet.A
Notes: Begin review process on new work crew candidates

Access: Local. Login: Loken.M
Notes: Access Surface Work Crew Tracking

Access: Local. Login: Loken.M
Notes: Update maintenance requests

Access: Local. Login: Binet.A
Notes: Installing new operating system software

Note: This entry version replaces the default after being told to investigate the terminals in Robotics during Plugging a Leak.

Transcript

ACCESS LOG

Access: Local. Login: Binet.A
Notes: Update maintenance requests

Access: Local. Login: Binet.A
Notes: Begin review process on new work crew candidates

Access: Local. Login: Loken.M
Notes: Access Surface Work Crew Tracking

Access: Local. Login: Loken.M
Notes: Update maintenance requests

Access: Local. Login: Binet.A
Notes: Installing new operating system software

Access: Remote (Binet Quarters). Login: -----
Notes: ERROR: RECORD DELETED

Robotics terminal[]

This wall-mounted Institute terminal is located on the southern wall, to the left.

Transcript

==== Institute Central Network ====
ROBOTICS TERMINAL 2C

Production Schedule[]

Transcript

GROUP ID 26267B
Group Classification: G3 Specialized (Labor)
Role Specification: Excavation & Construction, Project ID E661
Units Scheduled: 3

GROUP ID 31215G
Group Classification: G3 Standard
Role Specification: Operations & Maintenance, Project ID A119
Units Scheduled: 2

GROUP 49831F
Group Classification: G2 Security
Role Specification: Salvage Operations, Project ID K433
Units Scheduled: 4

GROUP 63175B
Group Classification: G3 Standard
Role Specification: Operations & Maintenance, Project ID B787
Units Scheduled: 1

Planned System Upgrades[]

Current Project[]

Transcript

PROJECT IDENT 7998756453
Status: Approved, in progress. See Implementation Status below for details.
Description: Implementation of new synthetic optic nerve tissue
Goals: 10%-12% increase in visual acuity

UPGRADE IMPLEMENTATION STATUS
Units Scheduled: 19
Units Upgraded: 12

NOTES:

"Next scheduled units: C4-61, J7-95. Other units scheduled and ready to fill in for the duration of the upgrade" [ABinet]

"Upgrade completed on units T7-22, P8-74, D5-58." [MLoken]

"Next scheduled units: T7-22, P8-74, D5-58. Other units scheduled and ready to fill in for the duration of the upgrade." [ABinet]

"Upgrade completed on units V5-28, S3-22, R4-46." [MLoken]

"Next scheduled units: V5-28, S3-22, R4-46. Other units scheduled and ready to fill in for the duration of the upgrade." [ABinet]

Upcoming projects[]

Transcript

PROJECT IDENT 3846106734
Status: Approved, awaiting implementation.
Description: Motor reflex response time improvements
Goals: 7% increase in motor reflex reaction time

PROJECT IDENT 8102948562
Status: Approved, awaiting implementation.
Description: Targeting software package upgrade
Goals: 5%-8% increase in ranged weapon accuracy

PROJECT IDENT 5810274864
Status: Awaiting approval
Description: Complete transfusion to replace type 77-01 synthetic blood with type 90-10

Goals: More rapid clotting, improved infection resistance

View Access Logs[]

Transcript

ACCESS LOG

Access: Local. Login: Binet.A
Notes: Access Production Schedule

Access: Local. Login: Binet.A
Notes: Routine diagnostic on Courser designate X6-88, all functions nominal

Access: Local. Login: Binet.A
Notes: Updated Production Schedule

Access: Remote. Login: Ayo.J
Notes: REDACTED

Access: Local. Login: Binet.A
Notes: More programming work on new AI software update

Access: Local. Login: Loken.M
Notes: Access Planned System Upgrades

Access: Local. Login: Binet.A
Notes: Prototype testing of neural net upgrades

Robotics terminal 2[]

This terminal is not used in-game. Its Creation Kit ID indicates that it would have been used as a submenu for Robotics Terminal 2C (the terminal listed just above this one.)

Transcript

==== Institute Central Network ====
SYNTH LAB TERMINAL 2

SRB Investigation[]

Transcript

As you are all aware, from time to time one of our Gen 3 synths assigned to surface duty will malfunction and go off assignment. While only a rare occurrence in the past, in recent months we have seen the number of losses rise noticeably.

Doctor Ayo has opened an investigation into this matter, and I must ask that you all give him your full cooperation as he looks into this troubling issue. Please answer his questions as completely as you can, and provide Dr. Ayo with any logs, materials or other items he requests.

With your help, I'm sure we can resolve this matter quickly.

Thank you,

- Father

Gen 1 phase-out[]

Transcript

Per Father's plans as discussed at the recent Directorate meeting, we will soon begin to phase out our Gen 1 synth units within the Institute, with the intention of relegating all remaining units to surface duties only.

Our first generation synths have served admirably and exceeded their design specifications in virtually every category, but the remarkable breakthroughs in synth design and production that have led to our latest, more aesthetically-pleasing models herald a time for change.

Over the next several years, we expect to replace all Gen 1 units with Gen 3 units, and in time, we will enact a similar plan with the Gen 2 units as well.

As we look toward the future, let us also honor the memories of those whose hard work and innovation made the synths possible, and let us never forget the singular vision that challenged our forebears and that drives us today: Mankind - Redefined.

- Dr. Alan Binet

Unique Project[]

Transcript

Overriding directive to not alter our synths' basic functioning notwithstanding, Father has granted clearance for a rather unique project.

In select Gen 3 units, the synthetic brain is indeed capable of accepting specific enhancements to the visual cortex, basal ganglia and right parietal cortex. The result is substantially improved combat effectiveness, due to two factors:

1.) An increased understanding of weapon accuracy, to the extent that the combatant can actually visualize the percentage of effectively hitting targets (or smaller areas on those targets).

2.) An altered sense of perception that mimics the effect of slowing, or even stopping, time.

Recommend we commence surgery and field trials on appropriate operatives in the near future.

Notes[]

The "Unique Project" entry from the cut Robotics terminal 2 seems to reference the VATS system as it appears in Fallout 4 gameplay.

Advertisement